Control of Hydraulic Transients in the Water Piping System in Badra – Pumping Station No. 5

Authors

  • Miqdam Tariq Chaichan Mechanical Engineering Dep. - University of Technology
  • Dina Saadi Muneam Al-Zubaidi Mechatronics Eng. Dept. - Al Khwarizmi Collage of Eng.

Keywords:

water hammer, surge, pipeline profile, pumping system

Abstract

In this paper, the surge tank utilization method was used to prevent the water hammer. The study was conducted on a practical problem at pipelines and pumping station of Badra – pumping station No. 5, which is possessed to Iraqi General Company for Execution and Irrigation. For this purpose, Surge2012 transient analysis software was used to achieve the best design and checking parameters.
The study recommends installing 2x14m3 closed surge tanks near to lifting station. The outlet/inlet nozzle has to be of 300 mm diameter. The initial air volume must be 5 m3 for each one. All these parameters must be achieved to maintain a positive and negative pressure waves in pipe network system within accepted values.

Downloads

Download data is not yet available.

Downloads

Published

31-05-2017

How to Cite

[1]
M. T. Chaichan and D. S. M. Al-Zubaidi, “Control of Hydraulic Transients in the Water Piping System in Badra – Pumping Station No. 5”, NJES, vol. 18, no. 2, pp. 229–239, May 2017, Accessed: Nov. 25, 2024. [Online]. Available: https://nahje.com/index.php/main/article/view/181

Similar Articles

31-40 of 270

You may also start an advanced similarity search for this article.