Al-Nahrain Journal for Engineering Sciences
Login
NJES
  • Home
  • Articles & Issues
    • Latest Issue
    • All Issues
  • Authors
    • Submit Manuscript
    • Guide for Authors
    • Submission Resources
    • Authorship
    • Article Processing Charges (APC)
  • Reviewers
    • Guide for Reviewers
    • Become a Reviewer
  • Policies
    • Publication Ethics
    • Plagiarism
    • Allegations of Misconduct
    • Appeals and Complaints
    • Corrections and Withdrawals
    • Open Access
    • Archiving Policy
    • Copyright Policy
  • About
    • About Journal
    • Aims and Scope
    • Editorial Team
    • Journal Insights
    • Peer Review Process
    • Abstracting and Indexing
    • Announcements
    • Contact

Search Results for time-cost-model

Article
Modeling Contractor’s Cash-in-Flow in Public School Building Projects in Karbala

Zeyad S. M. Khaled, Gafel Kareem Aswed

Pages: 1064-1070

PDF Full Text
Abstract

Public school building projects in Karbala Province experiences payment problems due to improper cash-flow planning by both parties; contractors and clients. These payment problems lead to work stoppages and conflicts. This research aims at developing a suitable model to forecast the expected contractors’ cash-in-flow in public school building projects in Karbala based on historical data. Complete sets of interim payments of (33) out of (38) school building projects finished in the years (2007-2012) in Karbala were interpolated using seven different regression methods namely;  Polynomial, Gompertz, Morgan-Morgan-Finney, Logistic, Exponential, Gaussian and Linear in order to identify the best-suited model. It is found that the third degree polynomial model is more suitable for cash-in-flow forecasting of the case under study with coefficient of correlation of (97.89%) and standard error of (0.0441). Data of the remaining (5) projects were used to test the validity of the best-fitted model using Mean Absolute Percentage Error, Root Mean Square Error and Average Accuracy Percentage. The model is expected to be of high advantage in predicting contractors’ cash-in-flow in public school building projects in Karbala, and consequently clients’ cash-out-flow as well._x000D_  

1 - 1 of 1 items

Search Parameters

×

The submission system is temporarily under maintenance. Please send your manuscripts to

Go to Editorial Manager
Journal Logo
Al-Nahrain Journal for Engineering Sciences (NJES)

College of Engineering, Al-Nahrain University

  • Copyright Policy
  • Terms & Conditions
  • Privacy Policy
  • Accessibility
  • Cookie Settings
Licensing & Open Access

CC BY NC 4.0 Logo Licensed under CC-BY-NC-4.0

This journal provides immediate open access to its content.

Editorial Manager Logo Elsevier Logo

Peer-review powered by Elsevier’s Editorial Manager®

Copyright © 2026 College of Engineering, Al-Nahrain University, its licensors, and contributors. All rights reserved, including those for text and data mining, AI training, and similar technologies. For all open access content, the relevant licensing terms apply.