Modeling Contractor’s Cash-in-Flow in Public School Building Projects in Karbala

Abstract

Public school building projects in Karbala Province experiences payment problems due to improper cash-flow planning by both parties; contractors and clients. These payment problems lead to work stoppages and conflicts. This research aims at developing a suitable model to forecast the expected contractors’ cash-in-flow in public school building projects in Karbala based on historical data. Complete sets of interim payments of (33) out of (38) school building projects finished in the years (2007-2012) in Karbala were interpolated using seven different regression methods namely;  Polynomial, Gompertz, Morgan-Morgan-Finney, Logistic, Exponential, Gaussian and Linear in order to identify the best-suited model. It is found that the third degree polynomial model is more suitable for cash-in-flow forecasting of the case under study with coefficient of correlation of (97.89%) and standard error of (0.0441). Data of the remaining (5) projects were used to test the validity of the best-fitted model using Mean Absolute Percentage Error, Root Mean Square Error and Average Accuracy Percentage. The model is expected to be of high advantage in predicting contractors’ cash-in-flow in public school building projects in Karbala, and consequently clients’ cash-out-flow as well._x000D_  

References

  1. Banki, M. T. and Esmaeeli, B. (2008), “Using Historical Data for Forecasting S-curves at Construction Industry”, Proceedings of the IEEE International Conference, Singapore, Pp. 282-286.
  2. Blyth, K. and Kaka, A. (2006), “A Novel Multiple Linear Regression Model for Forecasting S-curves”, Journal of Engineering, Construction and Architectural Management, Vol. 12, Issue 1, Pp. 82-95.
  3. DeFond, M. L. and Hung, M., (2003), “An Empirical Analysis of Analysts’ Cash-Flow Forecasts”, Journal of Accounting and Economics, Vol. 35, Pp. 73–100.
  4. El-Kholy, A. M., (2014), “A Multi-Objective Fuzzy Linear Programming Model for Cash-flow Management” International Journal of Engineering Research and Applications (IJERA), Vol. 4, Issue 8 (Version 3), Pp. 152-163.
  5. Karbala Governorate Council, (2015), “More Than Five Million Dinars the Cost of Constructed School Projects in Karbala”, issued by Reconstruction and Strategic Planning Committee (In Arabic).
  6. Kenley, R. (2003), “Financing Construction: Cash-Flows and Cash Farming”, 1st edition, Spon Press, New York.
  7. Khosrowshahi, F. (2001), “Project Cash-Flow Forecasting: A Mathematical Approach”, Proceedings of the 17th Annual ARCOM Conference, 5-7 September 2001, University of Salford. Association of Researchers in Construction Management, Vol. 1, Pp. 391-400.
  8. Khosrowshahi, F. and Kaka, A., (2007), “A Decision Support Model for Construction Cash-Flow Management”, Journal of Computer-Aided Civil and Infrastructure Engineering, Vol. 22, Pp. 527-539.
  9. Matloob, Y. L. H., (2005), “Forecasted Scheduling and Cash-flow for Repetitive Construction Projects”, MSc. thesis, College of Engineering, Baghdad University.
  10. Mavrotas, G., Caloghirou, Y. and Koune, J., (2005), “A Model on Cash-Flow Forecasting and Early Warning for Multi-Project Programmes: Application to the Operational Programme for the Information Society in Greece”, International Journal of Project Management, Vol. 23, Issue 2, Pp. 121-133.
  11. MOEDU, (2014), “Statistics of the Department of Educational Planning”, the Ministry of Education, in cooperation with the Central Statistical Organization in the Ministry of Planning, (In Arabic).
  12. MOP, (2012), “Synopsis of the National Development Plan 2013-2017” the Ministry of Planning and Developing Cooperation (In Arabic).
  13. Ng, S. T., Mak, M. M. Y., Skitmore, R. M., Lam, K. C. and Varnam, M., (2001), “The Predictive Ability of Bromilow's Time-cost Model”, Construction Management and Economics, Vol. 19, No. 2, Pp. 165-173.
  14. Park, H. K., Han, S. H. and Russell, J. S., (2005), “Cash-Flow Forecasting Model for General Contractors using Moving Weights of Cost Categories”, Journal of Management in Engineering, Vol. 21, Issue 4, Pp. 164-172.
  15. Tran, H., and Carmichael, D. G., (2012), “Contractor’s Financial Estimation Based on Owner Payment Histories”, International Journal of Organization, Technology and Management in Construction, Vol. 4, No. 2, Pp. 481-489.